Flexible grounding body HD-R10 is mainly used for grounding network
of buried resistance reduction; the original metal grounding body
corrosion effect is relatively poor, in addition is not suitable
for mountainous areas, especially rocky areas to use, flexible
grounding body HD-R10 is suitable for grounding resistance
reduction in mountainous rocky areas, not subject to geographical
conditions, can be made on site, according to the site conditions
molding, no corrosion of the metal connection body, good resistance
reduction effect, this flexible The grounding body is composed of
non-metallic conductive powder, polymer materials and microfiber
adhesive. Its use is not limited by environmental conditions, as
long as the amount of construction can receive the effect of
resistance reduction, long service life, resistance reduction
effect is stable.
A remarkable feature of flexible grounding body HD-R10 is that it
can form an irregular shape and an effective contact area between
it and the medium, thus obtaining a good resistance reduction
effect. This is something that no grounding pole and grounding
module could do in the past.
Construction of flexible grounding body
(1) Flexible grounding body is a kind of compound formula product.
It includes:
conductive agent, preservative, blending agent, flexibility agent,
channel agent,
coagulant, catalyst, etc.
(2) First dig the grounding trench, weld the horizontal grounding
body, and the
vertical grounding electrode.
(3) Open the lid of the barrel and take off the two bags of raw
materials stuck to
the inner lid.
(4) Open the plastic bag and turn the plastic bag over to the
outside of the
barrel with a wooden stick into the barrel to stir the sediment and
liquid. (When the
temperature is low, you should use a heating rod to warm up the
liquid in the barrel
to about 30 degrees)
(5) Open the two external bags of raw materials and add them to the
liquid and
stir well, and take them to the edge of the ditch, or the pit, to
be used.
(6) As vertical pouring can be poured directly.
(7) If you do horizontal pouring, you need to keep stirring slowly
until the
resistance of the liquid in the barrel increases and becomes sticky
like porridge, then
pour it into the trench to wrap the horizontal grounding body and
form a long line of
pouring while pouring.
(8) wait for its solidification to form with elastic grounding
conductor, at this
time will no longer dissolve in water, can be backfilled, the
construction of flexible